Skip to content

Track proofs ​

For some defects, the company should prove that it fixed them. For example with a photo or a test certificate. Zepia keeps track of where a proof is missing.

Ask for proof ​

Web:

  1. Open the finding in the review.
  2. Under Manual Fields, tick Proof required?
  3. Enter the deadline and click Save.
Ask for and tick off proof under Manual Fields
Manual fields with proof required, deadline and proof submitted

Ask for and tick off proof under Manual Fields

App: In the review, turn on Proof Required.

The report then shows "proof required" with the deadline at that finding. You can switch this on and off in the report template with Show Proof Required.

Tick off a proof ​

The company sends you the proof as usual, for example by email. Then:

  1. Open the finding on the web.
  2. Under Manual Fields, tick Proof submitted? and click Save.

See the state of an inspection ​

Open the inspection on the web. As soon as a finding needs proof, you see Evidence Status, for example "1 of 3 proofs submitted".

The evidence status of the inspection
Inspection with evidence status: pending, 1 of 3 proofs submitted

The evidence status of the inspection

  • Pending means at least one proof is still missing.
  • The tick icon next to it (Mark all pending proofs as submitted) ticks them all off at once.
  • By mistake? Click Undo right away. This only works until you leave the page.

In the list, findings with Imminent Danger or Safety Violation also show Proof pending or Proof submitted.

For the next inspection

Open the inspection on the web and choose Export → Action list (CSV). It shows for every finding whether the proof is open, provided, or not required.